So, tracks were lade using the sticks and the rails were made from GW movement tray sides. It was also the time to start laying the river sand/slate. Lots of PVA glue (had to pop back to the shops cause was a bottle short). The globes were more interesting. Their bases were Berocca lids with the moister absorbing bit removed (I think that's what it is) with a marble placed in the hole.
No comments:
Post a Comment