Saturday 18 July 2015

Base rage madness

This is the second day I've spent working on my Gremlin bases and my tolerance for irritation is reaching it's limits. The cutting and shaping of sticks into wood planks took most of yesterday and today I've been working on getting the painting and the gluing of water grass and planks into place. That should be done by tonight, but this also leaves the problem of the water effects, that problem being getting enough plastic strips of the right size for the holding. Seems getting enough for a 2mm height and still be straight when cutting is proving a lot harder then I thought and my tool options are limited. Am trying a variety of plastics, but so far no real luck.

No comments:

Post a Comment